Sunday, 19 April 2015

Buildings Progress


Unique Building 1:

Unique Building 2:

Generic Building 1:



Bridge & minor asset UV unwraps

Bridge:



Cart:





Lamppost:




Barrel:



Broken barrel:



The UV unwraps for the statues have proven difficult, so they're still a work in progress. However, I hope to have them and the majority of the textures finished by the end of next week.

-Chloe

Cathedral Update

Lewis;

While preparing for the engine I decided to add more geometry to the original Cathedral. At the beginning I thought it would be possible to represent a lot of the structure as a texture but that didn't work out, which is why I built more to add to the structure.

New Cathedral Parts/Structures;





New structures added to the original;